精品啪在线观看国产九色_一区二区不卡区日韩_兰花草电影在线观看_狠狠色丁香婷婷久久_国产极品美女高潮无套175_飘雪电影完整版在线观看免费_自拍欧美日韩在线_日韩爆乳无码中文字幕网站_中文字幕有码免费一区二区_80岁耋耋ChⅰheSe老太交

Location: Home > News Update > News Update
Longest Tunnel of China-Laos Railway Cut Through
Source: Date:2020年12月10日

Anthem of CREC—“Trailbreaker”

Anding Tunnel, the longest along the China-Laos Railway, designed by China Railway Eryuan Engineering Group Co., Ltd. and constructed by China Railway No.5 Engineering Group Co., Ltd., was cut through on November 28, laying the foundation for the completion of the entire railway on schedule.

Anding Tunnel

Construction of the 17,476-meter-long Anding Tunnel lasted four years. It is the longest of the 169 tunnels along the China-Laos Railway, as well as a key control project. Located in the Ailao Mountains featuring high peaks and deep valleys, the tunnel was very difficult to design and construct due to complicated topographical conditions.

So far, all tunnels of the Lao section of the China-Laos Railway have been dug through. With the completion of the Anding Tunnel, 86 of the railway’s 93 tunnels in China have been cut through.

The China-Laos Railway is a project aligning China’s Belt and Road Initiative and Laos’ vision of transforming from a landlocked to a land-linked country. After the completion of the railway, it is expected that passengers will be able to set out from Kunming in southwest China’s Yunnan Province in the evening and reach Vientiane the next morning.

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://nstpm.com.cn/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved