精品啪在线观看国产九色_一区二区不卡区日韩_兰花草电影在线观看_狠狠色丁香婷婷久久_国产极品美女高潮无套175_飘雪电影完整版在线观看免费_自拍欧美日韩在线_日韩爆乳无码中文字幕网站_中文字幕有码免费一区二区_80岁耋耋ChⅰheSe老太交

Location: Home > News Update > News Update
Vientiane-Luang Prabang Section of China-Laos Railway Completed
Source: Date:2021年01月01日

Anthem of CREC—“Trailbreaker”

On December 29, 2020, the Vientiane-Luang Prabang Section of China-Laos Railway was completed. Constructed by China Railway No.2 Engineering Group, the project lays a solid foundation for completing the whole China-Laos Railway before May 2021 and putting the whole line into service by December 2021.

Since the track laying began on March 27, 2020, 240 kilometers of the main track have been laid from Vientiane to Luang Prabang, making up 57 percent of the total length of the Laos section of the railway. At present, the main parts of the underground tunnels, bridges, and subgrades have been basically completed, and all the station buildings along the line have been capped. With the completion and operation of the China-Laos Railway, the journey time from Kunming, China, to Vientiane, Laos, is expected to be shortened to less than 12 hours. (By China Railway No.2 Engineering Group, Zang Heng, and Duan Yunchuan)

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://nstpm.com.cn/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved