Anthem of CREC—“Trailbreaker”
Constructed by China Railway No.9 Group Co., Ltd., the Second Bid Section of Cukaru Peki Copper-Gold Concentration Plant in Serbia was recently completed, with all the six construction goals of the project achieved ahead of schedule.
The project mainly includes six sub-projects, namely the concentrate filter press workshop, the copper concentrate thickening ponds, the sulfur concentrate thickening ponds and conveying pump room, the tailings thickening ponds and conveying pump room, the processing plant collection ponds, and the tailings chutes.
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://nstpm.com.cn/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved