精品啪在线观看国产九色_一区二区不卡区日韩_兰花草电影在线观看_狠狠色丁香婷婷久久_国产极品美女高潮无套175_飘雪电影完整版在线观看免费_自拍欧美日韩在线_日韩爆乳无码中文字幕网站_中文字幕有码免费一区二区_80岁耋耋ChⅰheSe老太交

Location: Home > News Update > News Update
Track-laying of Vientiane-Luang Prabang Section of China-Laos Railway Completed
Source: Date:2021年01月18日

Anthem of CREC—“Trailbreaker”

On December 29, 2020, the CYP track laying machines of CREC arrived at the Luang Prabang Railway Station in Laos, marking the completion of the track laying between Vientiane and Luang Prabang on the China-Laos Railway and laying a solid foundation for completing the whole line by May 2021 and opening the railway to traffic in December.

The track-laying of the railway started on March 27, 2020. So far, 240 kilometers of rails on the main line from Vientiane to Luang Prabang have been in place, which means that 57 percent of the whole railway section in Laos has been finished.

The China-Laos Railway starts from Kunming, the capital city of Yunnan Province, in the north, and ends in Vientiane, the capital of Laos, in the south. The whole line is divided into the China section and the Laos section, and the total length of the Laos section is 422.4 kilometers.

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://nstpm.com.cn/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved