With a total length of 25.2 kilometers, the project runs through Zhengzhou City, starting from the southwest expressway in the south and ending in Lianhuo Expressway in the north. Started at the end of 2010 and opened to traffic at the end of 2011, it is located at the downtown area of Zhengzhou, which is also the first municipal bridge project with great construction difficulty in the Central Plains. Its two main piers near the railway have a diameter of 2.2 meters and a depth of 70 meters. It was highly appraised by the government and railway bureau of Zhengzhou City.
Fast Track Project from Jingguang Road to Shakou Road in Zhengzhou City