The total length of the line is 39.75 kilometers, of which the underground line is about 31.18-kilometer-long, the elevated line is about 8.12-kilometer-long, the ground line and the open section are about 450-meter-long. It set 25 stations and the total investment of the project is about 20 billion yuan.
Phase I Project of Chongqing Metro Line 5