Anthem of CREC—“Trailbreaker”
The track laying work for Phonethong super major bridge, the longest bridge along the China-Laos railway, was completed on August 11. So far, only 2.3 kilometers of track-laying is left for the 422.4-kilometer main line of Boten-Vientiane section of the China-Laos railway, just one step away from opening of the whole line.
Phonethong super major bridge is located in Vientiane, Laos, with a length of 7528.56 meters. China Railway No.2 Engineering Group undertakes track laying.
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://nstpm.com.cn/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved