精品啪在线观看国产九色_一区二区不卡区日韩_兰花草电影在线观看_狠狠色丁香婷婷久久_国产极品美女高潮无套175_飘雪电影完整版在线观看免费_自拍欧美日韩在线_日韩爆乳无码中文字幕网站_中文字幕有码免费一区二区_80岁耋耋ChⅰheSe老太交

Location: Home > News Update > News Update
World’s First Full-face Hard-rock Shaft TBM Put into Operation
Source: Date:2021年12月31日

Anthem of CREC—“Trailbreaker”

  The world’s first full-face hard-rock shaft tunnel boring machine (TBM) was successfully used in a construction site for an exhaust shaft of the pumped-storage power station in Ninghai, Zhejiang Province, on December 28. The successful use of the TBM, which was independently developed by China Railway Engineering Equipment Group Co., Ltd. under China Railway Hi-Tech Industry Co., Ltd., marked that Chinese TBM makers, represented by China Railway Engineering Equipment Group Co., Ltd., have solved global technical problems regarding full-face hard-rock TBM and can use the machine automatically in shafts.

1641956008

  China had been witnessing a void in the making and using of full-face hard-rock TBM, a type of high-end engineering equipment for mechanized and intelligent construction of shafts, for a long period of time. 

  China Railway Engineering Equipment Group Co., Ltd. has been dedicated itself to the research and development of shaft engineering equipment since 2011. In a course of 11 years, it successfully developed the world’s first full-face hard-rock TBM, code named “CREC 599.” The equipment integrated conventional shaft construction techniques and the idea of full-face hard-rock TBM. It is capable of building shafts in a safe and efficient manner, and is the first in the world to achieve dynamic subsidence and unmanned tunneling. The machine represents the world’s advanced level. 

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://nstpm.com.cn/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved