精品啪在线观看国产九色_一区二区不卡区日韩_兰花草电影在线观看_狠狠色丁香婷婷久久_国产极品美女高潮无套175_飘雪电影完整版在线观看免费_自拍欧美日韩在线_日韩爆乳无码中文字幕网站_中文字幕有码免费一区二区_80岁耋耋ChⅰheSe老太交

Location: Home > News Update > News Update
CREC-constructed 10th of Ramadan Railway Project in Egypt Passes Speed Test
Source: Date:2022年05月05日

Anthem of CREC—“Trailbreaker”

  On April 30 local time, the speed test train for the Ramadan project built by the CREC-AVIC International consortium started from Future Station and gradually accelerated to 125 km/h (the maximum design speed is 120 km/h). The test results showed that catenary voltage and pantograph-contact line relation were normal, the train's traction braking performance was good, and the target speed was achieved.

2  

  The10th of Ramadan Railway is the first rail transit system in Egypt with 27.5 kV AC traction power supply, which serves as an important traffic project for the country to implement its “eastward development” national strategy and to build its "eastern economic corridor". The success of this speed test indicates that the joint debugging and testing has entered a new stage, laying a solid foundation for the delivery and operation of the railroad on schedule. 

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://nstpm.com.cn/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved