精品啪在线观看国产九色_一区二区不卡区日韩_兰花草电影在线观看_狠狠色丁香婷婷久久_国产极品美女高潮无套175_飘雪电影完整版在线观看免费_自拍欧美日韩在线_日韩爆乳无码中文字幕网站_中文字幕有码免费一区二区_80岁耋耋ChⅰheSe老太交

Location: Home > News Update > News Update
World’s First Single-Tower Single-Span Steel Box Girder Suspension Bridge Joined Together
Source: Date:2022年03月18日

Anthem of CREC—“Trailbreaker”

  The Lvzhijiang Bridge on Yuchu (Yuxi-Chuxiong) Expressway was connected on March 9. Invested and managed by China Railway Development Investment Group, the bridge was mainly constructed by China Railway Major Bridge Engineering Group, with participation of China Railway Jiujiang Bridge Engineering under China Railway Hi-tech Industry Corporation Limited (CRHIC). Lvzhijiang Bridge breaks several world records: it is the first single-tower single-span steel box girder suspension bridge in the history of world highway construction, with the longest main span of the same type of bridge at 780 meters, and it has the world’s steepest tunnel anchorage, which is angled at 54 degrees. 

圖片1

  Lvzhijiang Bridge is a key control project of the Yuchu Expressway, with a total length of 798 meters and a two-way four-lane bridge deck with a design speed of 100 kilometers per hour. Both ends are directly connected with tunnels. The steel girder of the bridge is divided into 61 segments, with the steel box girder total weight of about 10,000 tons, equivalent to the weight of the Eiffel Tower. The maximum lifting capacity of a single segment exceeds 180 tons.

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://nstpm.com.cn/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved