Anthem of CREC—“Trailbreaker”
Phase I Project of Chengdu Metro Line 3 is implemented in the mode of “Investment & Financing + EPC + Repurchase”. The total length of the line is about 20.359 kilometers, which is from southwest to northeast. It starts at Hongpailou South Station and ends in Tianhuizheng South Station. There are 17 stations and 1 vehicle depot (the northern suburbs vehicle depot), all of which are underground lines. With a contractual investment of 6.9 billion yuan, the project started in May 2012 and opened for trial operation in June 2016.
Chengdu Metro Line 3 Project
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://nstpm.com.cn/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved