Anthem of CREC—“Trailbreaker”
YJ900 Mobile Bridge Erection Machine is suitable for the erection of 20-meter-long, 24-meter-long and 32-meter-long double-line full-hole concrete box girder for passenger dedicated line in mountain areas. After the girder is loaded to precast yard by the machine, it will be transported to the erection position through the access road, roadbed, bridge and culvert.
YL900 Mobile Bridge Erection Machine
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://nstpm.com.cn/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved