精品啪在线观看国产九色_一区二区不卡区日韩_兰花草电影在线观看_狠狠色丁香婷婷久久_国产极品美女高潮无套175_飘雪电影完整版在线观看免费_自拍欧美日韩在线_日韩爆乳无码中文字幕网站_中文字幕有码免费一区二区_80岁耋耋ChⅰheSe老太交

Location: Home > Core Business > Overseas Business
Construction of Flyover at Kuril Intersection, Bangladesh
Source:MBEC Date:2019年03月15日

Anthem of CREC—“Trailbreaker”

This bridge locates at the “T” intersection of Airport Road and Bishwa Road near Dhaka International Airport. The project includes a flyover with the length of 3,018m, a pedestrian bridge, road works, greening projects, power and lighting projects and underground pipeline relocation and diversion works. The superstructure of the flyover is composed of PC simple supported beam and box girders, while the substructure consists of 750-1,000mm bored piles. It was commenced in April 2010 and completed in May 2012.

Construction of Flyover at Kuril Intersection

 

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://nstpm.com.cn/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved