Anthem of CREC—“Trailbreaker”
It is the first cable-stayed bridge invested by Morocco. The bridge is 951.66m in length and the main bridge is three-span cable-stayed bridge including a 376m-long main span and two 183m-long side spans. The approach bridge is composed of five-span precast T-shape structure. The bridge was commenced in June 2010 and completed in April 2015.
Mohammed VI Bridge in Morocco
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://nstpm.com.cn/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved